Three-cell drainage culvert as part of the new Dammam-Jubail high-speed line in Saudi Arabia.
A massive statically-indeterminate integral construction from reinforced-concrete, constructed on a mat foundation.
This makes the construction economical and easy to maintain.
All the reinforcement-bars are protected with anti-corrosion paint.