The Project

Three-cell drainage culvert as part of the new Dammam-Jubail high-speed line in Saudi Arabia.


A massive statically-indeterminate integral construction from reinforced-concrete, constructed on a mat foundation.


This makes the construction economical and easy to maintain.


All the reinforcement-bars are protected with anti-corrosion paint.

Location
Saudi Arabia

Date
2014

Owner
Kingdom of Saudi Arabia
Saudi Railway Company

Architect
cubus Engineering
   

Contractor
CJV Terna – Alomaier

Our Scope of Works
Tender, Preliminary, Final Design, Construction Design

Characteristic images

Project location

Share this project

Similar projects

Arch Bridge, Saudi Arabia

A railway bridge of 560 meters in total with 17 spans, as an overpass at a railway junction. It is part of the new high-speed line connecting Damam with Jubail in Saudi Arabia, with a total length of 120 km.

cubus engineering

cubus engineering
7, Themistokli Sofouli Str.

154 51, Neo Psychiko
Athens, Greece

Contact Information
_______________________

Web: https://cubusengineering.gr
Email: cubusengineering@gmail.com
Tel.: 0030 210 6722360, 366, 389
Fax: 0030 210 6722 382

Follow us
_______________________