The Lycabettus Tunnel, in the center of Athens, with a total length of 210.00 m., was built in 1965 from reinforced concrete, using the “cut and cover” method…
Railway bridge, prefabricated, two 33-meter spans, as the overpass of the highway in Saudi Arabia. One of the bridges of the new high-speed connection…
A railway bridge of 560 meters in total with 17 spans, as an overpass at a railway junction. It is part of the new high-speed line connecting Damam with Jubail in Saudi Arabia, with a total length of 120 km.