Rail Over – Precast Bridge of 2x33m Spans, Saudi Arabia
Railway bridge, prefabricated, two 33-meter spans, as the overpass of the highway in Saudi Arabia. One of the bridges of the new high-speed connection…
Camel crossing bridge in the form of a closed frame, which is also a train – underpass to the new Dammam-Jubail railway line, in Saudi Arabia.
It is about 16 meters long and 15 meters wide, with a right-angled quadrilateral shape in plan view.
It is an integral system of reinforced concrete, based on a mat foundation.
The deck concreting took place onto a temporary soil banking up.
The entire bridge, including the abutments, the wing walls and the foundation, is an integral construction without joints.
This makes the construction economical and easy to maintain.
Location
Saudi Arabia
Date
2016
Owner
Kingdom of Saudi Arabia
Saudi Railway Company
Architect
cubus Engineering
Contractor
CJV Terna – Alomaier
Our Scope of Works
Tender, Preliminary, Final Design, Construction Design
Railway bridge, prefabricated, two 33-meter spans, as the overpass of the highway in Saudi Arabia. One of the bridges of the new high-speed connection…
Road bridge in the form of a closed frame, as an underpass to the new Damam-Jubail railway line in Saudi Arabia…
This is the largest airport of Jordan, and is located 20 miles south of Amman. The new terminal was completed in March 2013…
Frame for the protection the oil pipeline as an overpass to the new high-speed Damam-Jumbail railway line, in Saudi Arabia.
A Double Hangar 200x100m, of 42m height, for the Manama Airport of the Kingdom of Bahrain…
The largest airport in the country, designed with the prospect of future expansion. Its traffic has reached 24 million passengers in 2018…
The Lycabettus Tunnel, in the center of Athens, with a total length of 210.00 m., was built in 1965 from reinforced concrete, using the “cut and cover” method…
Three-cell drainage culvert to the new Damam-Jubail high-speed line in Saudi Arabia.
A railway bridge of 560 meters in total with 17 spans, as an overpass at a railway junction. It is part of the new high-speed line connecting Damam with Jubail in Saudi Arabia, with a total length of 120 km.
Contact Information
_______________________
Web: https://cubusengineering.gr
Email: cubusengineering@gmail.com
Tel.: 0030 210 6722360, 366, 389
Fax: 0030 210 6722 382
Follow us
_______________________
Main Menu
_____________
Home
Projects
Publications
Conferences
Seminars
Index
Keywords
About Us
Contact Us