PDF Keyword - Related Projects: Push Over

School in Athens, Sportshall

Existing reinforced concrete building, built in 1968, consists of a basement, ground floor and two floors, of square layout with a courtyard, architecturally and statically pioneering for its era. It is used as a high school of the German School Athens...

School in Athens, Main Building

Existing reinforced concrete building, built in 1968, consists of a basement, ground floor and two floors, of square layout with a courtyard, architecturally and statically pioneering for its era. It is used as a high school of the German School Athens...

Costa Perla Hotel, Ermioni

The "Costa Perla" hotel, built around 1975, in a beautiful bay of Argolida, near Ermioni, consists of a complex of three large reinforced concrete buildings, with no seismic walls, with basement, ground floor and 4 floors and scattered suites , built amphitheatrically on the hillside....

Apartment Buildings Complex, Algeria

Project of apartment buildings in progress in Algeria. Multi-storey structures of 10 to 15 floors will form a residential complex and require a quick and economic erection. ...

Football Stadium, Serres

Municipal football stadium in Serres, seat of the local football team, built in 1950 from reinforced concrete....

Private Clinic in Livadia

Multi-storey reinforced concrete building, consisting of a basement, ground floor, 3 floors and a top floor, in the Greek province of Livadia, which has been operating since 1960 as a private clinic....

IST Studies, Private College, Athens

The IST Studies Private University Building in Athens has an area of 15000m2 in three levels and resulted from five existing reinforced concrete frames, through complete redesign - reconstruction and seismic strengthening....