The Project

It is a clinker silo at the Lafarge Group “Aget-Heracles” plant in Milaki, Evia, made of reinforced concrete. It has a capacity of 25,000 tons of clinker, its diameter is 40 meters, its total height 23 meters and the thickness of the cylindrical shell 1 meter.


Its roof is made of metal frusto-conical construction and was erected partially.


In this way the inner scaffold was avoided.


The silo’s shell was founded on a surface foundation.


The cylindrical shell was constructed using conventional steel “formwork”.


The construction took just three months and then the conveyor lines were erected to connect the silo to the factory.


Particular attention was paid to the quality of concrete and the coating of reinforcement.


Strict requirements for “crack” control were also applied due to the large temperature differences between the clinker inside the silo and the external environment.

Location
Milaki

Date
2006

Owner
AGET Heracles – Lafarge Group

Architect

Contractor
SICAP SA

Our Scope of Works
Preliminary, Final Design, Construction Design

Characteristic images

Project location

Share this project

Similar projects

Gypsum Loading Crane, Altsi, Crete

Gypsum Loading Crane, Altsi, Crete

The gypsum quarry is located at Altsi, Sitia Municipality, Crete and has been owned by LAVA SA since 1980. It is an opencast quarry, operated following the method of exposed vertical benches.

HCC Cement Plant, Sharjah, U.A.E.

HCC Cement Plant, Sharjah, U.A.E.

It is a cement factory belonging to Hamriyah Cement Company in the Sharjah Free Zone – the capital of the homonymous emirate – of the United Arab Emirates.

cubus engineering

cubus engineering
7, Themistokli Sofouli Str.

154 51, Neo Psychiko
Athens, Greece

Contact Information
_______________________

Web: https://cubusengineering.gr
Email: cubusengineering@gmail.com
Tel.: 0030 210 6722360, 366, 389
Fax: 0030 210 6722 382