Apartment Buildings Complex, Nea Erythrea, Athens
These are ten reinforced concrete apartment buildings, built in 1969, in Nea Erythrea, Attica.
These are ten reinforced concrete apartment buildings, built in 1969, in Nea Erythrea, Attica.
Apartment building with ground floor, first floor and a smaller basement, built entirely out of reinforced concrete, in 1970 in Piraeus.
In the middle of a vineyard and at the site of the old building, which was completely demolished during the earthquake of 1953, on the island of Zakynthos, a new building was created in 2002 to resemble the old one.
Building in the center of Athens, consisting of two basement floors, seven floors and an attic. It is renovated architecturally and electromechanically and upgraded against earthquakes and fire.
The hotel complex "Miramare" was built in the 60's in Moraitika, Corfu and was renovated in the 1990s. In 2014, it was requested to undergo a radical renovation, complete architectural and electro-mechanical installations redesign, in order to create a luxurious, five-star hotel, resulting also in an
The "Costa Perla" hotel, built around 1975, in a beautiful bay of Argolida, near Ermioni, consists of a complex of three large reinforced concrete buildings, with no seismic walls, with basement, ground floor and 4 floors and scattered suites , built amphitheatrically on the hillside.
Conversion of an old factory building of the 1950s to a Health Center, a difficult task both for architectural redesign and for static upgrading, in order to serve the new purpose and the new function.
Existing hospital made of reinforced concrete, in Elefsina, Attica, consisting of a basement, a ground floor and a floor.
A heritage-listed building in the center of Athens, consisting of basement, ground floor, 1st and 2nd floor and an attic, is being renovated and converted into a shop and 4 apartments on the floors.
Neo-Classical listed building of the 1930s in Exarchia, in the center of Athens, with walls of stone masonry. It consists of a basement, a ground floor and a first floor and is to be completely rebuilt in relation to the supporting structure and E-M installations